6 PM - 8:30 PM - 2 PDHS Total
- 6:15PM to 8:15PM: Paralleling Requirements Including Traditional Paralleling Vs. On-Board Paralleling
Speaker - John Viserto, Cummins Power Generation
Paralleling
systems are critical to the synchronous operation of two or more generator sets
connected to a common bus. This seminar will discuss the electrical
requirements associated with having multiple power generating sources connected
in parallel. The traditional methods will be explained in detail and John will
discuss the advance of technology and integration of digital technologies to perform seamless paralleling operation. -
Dinner will be served. Includes Appetizer, Entree and Choice of Soda, Coffee or Tea